Use case

Delta Hydro Studio for Property developers

Delta Hydro Studio for developers: screening hydrology with every input on record, storm sizing context, and memos your consulting engineer can check and sign off.

Today

The pain

You need defensible hydrology inputs for layouts and stormwater coordination — without waiting weeks for every iteration.

With Studio

What changes

Run credible screening calculations early, then hand structured outputs to your consulting engineers for sign-off.

With your AI agent

Screen a site by asking for it

Ask your agent to screen a site before the layout is fixed. It delineates the catchment, runs the Rational peak before and after development and routes the difference through a detention basin. Each step is a saved record, so your consulting engineer checks the same numbers instead of starting again.

How agents use Studio
Something to ask it

Screen this 12 ha site: the 1:20 peak before and after development by the Rational method, and a detention basin that holds the outflow to the pre-development peak.

The agent runs Studio's engines and saves each result to your project. The review, and every engineering decision, stays with you.

Where to start

Tools teams reach for first

Book a tailored demo

Mention your sector and the tools you use in the Calendly questions, and we will prepare examples that match.

Start with the Stream plan

Explore with free credits, then upgrade when your volume grows.