Free calculator · Hydraulics

Weir flow calculator

The Weir Analysis tool turns head into discharge, discharge into head, builds a rating curve or finds the crest length that passes a flow, for ten weir types from a 90° V-notch to an ogee spillway. It picks the discharge coefficient from the weir geometry, iterates for approach velocity when you ask it to, and reduces the flow for a drowned crest with the Villemonte equation.

Weir flow calculator

Weir

Each type opens on its example from the guide below.

m
m

Along the flow.

m

Above the approach bed.

m

Approach channel.

Flow
m³/s
m

Optional. Blank for free flow.

Approach velocity

Head above crest
0.629m
Coefficient C
1.502m½/s
Upstream depth
1.429m
Weir results
Discharge, Q3m³/s
Head above crest, H0.629m
Coefficient, CBroad-crested table (USBR), at H/Lw = 0.421.502m½/s
Unit discharge, q = Q / L0.75m³/s per m
Upstream depth above bed, P + H1.429m

Rating curve

00.20.40.60.81123456Discharge (m³/s)Head above crest (m)This flow
Free flow

Keep this calculation

Studio accounts open soon. Join the waiting list and we'll e-mail you when you can save it in the full Weir Analysis tool.

  • Save to a project
  • Word, Excel and PDF report
  • Compound, Sutro and roadway weirs
  • Crest length sizing
  • Calibrated coefficient override

Runs the same calculation engine as Delta Hydro Studio. Results are computed in your browser; nothing you type leaves it until you choose to save.

Using the calculator above

The calculator opens on the broad-crested worked example further down this page, solving for the head that passes 3.0 m³/s, so you can check its numbers against the text. Picking another weir type loads that type’s check from the same section.

  • Solve for. Discharge from a measured head, or the head a design flow needs.
  • Crest length L and crest breadth Lw. L is measured across the channel and Lw along the flow (broad-crested only).
  • Crest height P and channel width B. The height of the crest, or of the V-notch vertex, above the approach bed, and the width of the approach channel. They set the approach velocity and the sharp-crested coefficient.
  • End contractions. How many crest ends are set in from the channel sides; none means the plate spans the channel.
  • Design head Hd. Ogee only: the head the crest profile was drawn for.
  • Tailwater above the crest. Optional. Leave it blank for free flow; a value applies the Villemonte reduction.
  • Approach velocity. Off by default. Include it to iterate on the energy head.

Each result names the coefficient’s source and warns when the inputs leave its range.

Weir equations by type

Every weir in the tool relates discharge to the head above its crest. Rectangular crests follow a 3/2-power law and triangular notches a 5/2-power law:

Q=Cd 232g  Leff H3/2Q=C L H3/2Q=Cd 8152g tan⁡ ⁣(θ2)H5/2Q = C_d\,\tfrac{2}{3}\sqrt{2g}\;L_{eff}\,H^{3/2} \qquad Q = C\,L\,H^{3/2} \qquad Q = C_d\,\tfrac{8}{15}\sqrt{2g}\,\tan\!\left(\tfrac{\theta}{2}\right) H^{5/2}

The first is the rectangular sharp-crested (thin-plate) weir, the second the broad-crested, Cipolletti and ogee form, and the third the V-notch.

SymbolMeaningUnits
QQDischargem³/s (ft³/s)
HHHead above the crest, or above the notch vertexm (ft)
LLCrest length across the channelm (ft)
LeffL_{eff}Effective length of a contracted sharp crest, L−0.1 ncHL - 0.1\,n_c H for ncn_c end contractionsm (ft)
CdC_dDimensionless discharge coefficient–
CCCoefficient with 232g\tfrac{2}{3}\sqrt{2g} absorbed; differs between SI and US customarym1/2/s\mathrm{m^{1/2}/s} (ft1/2/s\mathrm{ft^{1/2}/s})
θ\thetaV-notch angledegrees
PPCrest height above the approach channel bedm (ft)

A CC value converts from SI to US customary by multiplying by 1.811, the square root of 3.281. Dimensionless CdC_d values are the same in both systems.

Weir typeCoefficient in the toolTypical use
Rectangular, sharp-crestedRehbock: Cd=0.611+0.075 H/PC_d = 0.611 + 0.075\,H/PFlow measurement in flumes and small channels
Rectangular, broad-crestedCC from H/LwH/L_w, table belowField gauging structures, embankment crests
Cipolletti (1H:4V sides)CC = 1.859 SI (3.367 US), fixedIrrigation canals, no contraction correction
V-notchKindsvater-Shen CdC_d by angle, table belowLow flows
CompoundV-notch below, rectangular above, summedWide flow range in one structure
Proportional (Sutro)CdC_d = 0.61Linear head–discharge for dosing and treatment works
Ogee spillwayUSBR C0C_0 from P/HdP/H_d, adjusted for H/HdH/H_dDam and reservoir spillways
Broad-crested with approach velocityAs broad-crested, on the energy headNarrow approach channels, low crests
SubmergedAny of the five base types, with VillemonteDrowned crests
Irregular / roadwaySegment by segment along a station–elevation crest, with the FHWA HDS-5 paved or gravel road coefficient (1.38–1.71 SI)Road embankments and irregular controls

Approach velocity and submergence

Where the approach channel is narrow or the crest is low, the velocity head of the approaching flow adds to the measured head. The tool iterates:

Va=QB (P+H),He=H+Va22gV_a = \frac{Q}{B\,(P + H)}, \qquad H_e = H + \frac{V_a^2}{2g}

with BB the approach channel width, until QQ computed on HeH_e stops changing.

When tailwater rises above the crest, the Villemonte (1947) equation reduces the free-flow discharge QfQ_f:

Qs=Qf[1−(H2H1)n]0.385Q_s = Q_f\left[1 - \left(\frac{H_2}{H_1}\right)^{n}\right]^{0.385}

where H1H_1 and H2H_2 are the upstream and tailwater heads above the crest, and nn is the exponent of the free-flow equation.

Submergence H2/H1H_2/H_1Rectangular crest (nn = 1.5)V-notch (nn = 2.5)
0.20.9650.993
0.40.8940.960
0.60.7860.882
0.70.7120.816
0.80.6160.721
0.90.4770.569

Discharge coefficient tables

V-notch coefficients the tool applies, read from the Kindsvater-Shen curve for fully contracted notches in Bos (1989), interpolated for other angles. The curve ends at 100°; wider notches take the 100° value:

Notch angle22.5°30°45°60°90°100°120°
CdC_d0.5920.5860.5800.5760.5780.5800.580

Broad-crested coefficient against head over crest breadth LwL_w, the crest dimension in the direction of flow:

H/LwH/L_w0.1 to 0.30.40.50.60.81.01.21.52.03.0
CC (SI)1.491.501.511.531.581.651.721.771.821.85
CC (US)2.702.722.742.772.862.993.123.213.303.35

Ogee spillway base coefficient at the design head HdH_d, against crest height over design head:

P/HdP/H_d00.51.01.52.03.05.0
C0C_0 (SI)1.701.902.002.042.072.112.15
C0C_0 (US)3.083.443.623.703.753.823.89

Worked example: a broad-crested gauging weir

A broad-crested weir spans a 4.0 m wide rectangular channel. The crest is 4.0 m long, 1.5 m broad in the direction of flow and 0.8 m above the bed. The design flow is 3.0 m³/s.

  • Free flow, no approach velocity: the head is 0.629 m. H/LwH/L_w = 0.42, so CC = 1.502, and 1.502 × 4.0 × 0.629^1.5 = 3.0 m³/s.
  • With approach velocity: VaV_a = 3.0 / (4.0 × (0.8 + 0.615)) = 0.53 m/s and Va2/2gV_a^2/2g = 0.014 m. The head you would measure upstream is 0.615 m; the energy head over the crest is still 0.629 m.
  • Drowned by a tailwater 0.40 m above the crest: the upstream head rises to 0.720 m. The submergence ratio is 0.556 and the Villemonte factor 0.814.
  • Sizing: to pass 3.0 m³/s with no more than 0.50 m of head, the crest must be 5.68 m long (CC = 1.49).

The upstream water level in free flow, 0.8 + 0.629 = 1.43 m above the bed, is the control depth for a backwater profile up the channel in the gradually varied flow calculator.

Two smaller checks with the same tool: a 90° V-notch at 0.20 m head passes 0.0244 m³/s. A 1.0 m sharp-crested rectangular weir with two end contractions, 0.5 m high, at 0.25 m head has CdC_d = 0.611 + 0.075 × 0.5 = 0.649 and LeffL_{eff} = 0.95 m, and passes 0.227 m³/s. A Cipolletti weir with the same 1.0 m crest at the same head passes 0.232 m³/s.

Inputs and where they come from

  • Head. Measure it far enough upstream to be clear of the drawdown over the crest, at least four to five times the maximum head.
  • Crest height PP and approach width BB. From the drawings. They set the approach velocity and the Rehbock coefficient.
  • Crest breadth LwL_w. For broad-crested weirs only; it decides the coefficient.
  • Design head HdH_d. For ogee crests, the head the crest shape was drawn for.
  • Tailwater head. For a submerged weir, the downstream level above the crest, often the normal depth of the downstream channel from the Manning’s equation calculator.

Limitations

  • Below about 0.06 m of head, surface tension and viscosity make every standard coefficient unreliable.
  • Sharp-crested coefficients assume an aerated nappe that springs clear of the plate. A nappe clinging to the downstream face passes more flow than the equations predict.
  • Crest height should be at least twice the head for the standard sharp-crested coefficients; below that, include approach velocity.
  • Villemonte’s correction becomes uncertain at high submergence. Do not rely on a drowned weir for flow measurement above a ratio of about 0.85.
  • The ogee coefficient away from the design head follows a simplified adjustment. For a dam spillway, follow the full USBR Design of Small Dams procedure and the dam safety evaluation requirements where they apply.
  • For a road overtopping at a culvert crossing, use the culvert calculator, which balances the flow through the barrel against the flow over the road.

What a free Studio account adds

A free Delta Hydro Studio account includes the Weir Analysis tool, which runs the same engine with more of it exposed:

  • The weir types the calculator above leaves out: compound (a V-notch below a rectangular crest), proportional (Sutro), and irregular crests or road embankments entered as station–elevation points.
  • Two more solve modes: a rating curve over a head range you choose, and the crest length that passes a design flow at a maximum head.
  • A coefficient override for calibrated structures, and a coefficient lookup listing the formula and typical range for every weir type.
  • The rating curve as a chart you can download, and as a stage–discharge table you can send straight to the Detention Basin Designer for storage routing (the detention pond calculator page explains that method).
  • The calculation saved to a project and exported as a Word, Excel or PDF report.
FAQ

Common questions

What is the equation for flow over a weir?
For a rectangular crest, discharge varies with head to the power 1.5: Q = C L H^1.5, where L is the crest length and H the head above the crest. For a sharp-crested weir C is written as Cd × (2/3) × √(2g), with Cd about 0.61 to 0.65. A V-notch varies with head to the power 2.5: Q = Cd × (8/15) × √(2g) × tan(θ/2) × H^2.5.
What discharge coefficient should I use for a broad-crested weir?
In the SI form Q = C L H^1.5, the tool's broad-crested coefficient runs from 1.49 when the head is small compared with the crest breadth to 1.85 when the head is three times the breadth. In US customary units the same range is 2.70 to 3.35. Calibrated field values beat any table, so use them when a structure has been rated.
How do you calculate flow through a 90 degree V-notch weir?
Use Q = Cd × (8/15) × √(2g) × tan(θ/2) × H^2.5 with tan(45°) = 1. With the Kindsvater-Shen coefficient of 0.578 that the tool applies to a 90° notch, a head of 0.20 m gives 0.578 × 0.533 × 4.43 × 0.0179 = 0.0244 m³/s, or 24.4 litres per second. Head is measured above the notch vertex.
What is a Cipolletti weir?
A Cipolletti weir is a sharp-crested trapezoidal weir with side slopes of 1 horizontal to 4 vertical. The sloping sides add about as much flow as the end contractions of a rectangular notch take away, so a single fixed coefficient applies with no contraction correction: Q = 1.859 L H^1.5 in SI units, or 3.367 L H^1.5 in US customary units.
How does submergence affect flow over a weir?
Once tailwater rises above the crest, the weir passes less flow for the same upstream head. The Villemonte equation scales the free-flow discharge by [1 − (H2/H1)^n]^0.385, with n = 1.5 for rectangular crests and 2.5 for V-notches. At a submergence ratio of 0.6 a rectangular weir passes about 79% of its free flow; at 0.9, about 48%.
Full documentation: Weir Analysis
Every input, option and equation in the Studio tool, with its limitations.

References

  1. US Bureau of Reclamation (2001) Water Measurement Manual, 3rd ed., revised reprint. US Department of the Interior, Denver.
  2. US Bureau of Reclamation (1987) Design of Small Dams, 3rd ed. US Department of the Interior, Denver.
  3. International Organization for Standardization (2017) ISO 1438: Hydrometry — Open channel flow measurement using thin-plate weirs. ISO, Geneva.
  4. Villemonte, J.R. (1947) Submerged-weir discharge studies. Engineering News-Record, 139(26), 866–869.
  5. Kindsvater, C.E. and Carter, R.W. (1957) Discharge characteristics of rectangular thin-plate weirs. Journal of the Hydraulics Division, ASCE, 83(HY6).
  6. Bos, M.G. (ed.) (1989) Discharge Measurement Structures, 3rd revised ed. Publication 20, International Institute for Land Reclamation and Improvement (ILRI), Wageningen.
  7. Federal Highway Administration (2012) Hydraulic Design of Highway Culverts, Hydraulic Design Series No. 5, 3rd ed. FHWA-HIF-12-026. FHWA, Washington DC.
  8. Chow, V.T. (1959) Open-Channel Hydraulics. McGraw-Hill, New York.

Last reviewed by the Delta Hydro engineering team.

Keep the whole study in one place

Delta Hydro Studio puts this tool alongside catchment, rainfall, runoff and hydraulics tools, with projects, team sharing and Word and Excel reports.